Customer: ÖBB Infrastruktur Bau AG
Construction period: 01.2008 – 06.2012
Location: St. Pölten, Lower Austria
Country: Austria
In the course of the extension of the new Westbahn line, the railway station Sankt Pölten has to be rebuilt. For this the railway building and forecourts are renovated, the platforms, railway sidings and overhead construction line systems are rebuilt.
ALPINE-ENERGIE services
Removal of overhead construction line systems and top wires
Disassembly and extraction of poles
Placing und assembly of poles
Construction of temporary arrangements
Drawing on bearing wire, contact wire and top wires
Establishing track field lightings and earthing








