Customer: EVN Netz GmbH
Construction period: 06.2007 – 09.2009
Location: Lower Austria
Country: Austria
Construcion of 380 kV line control unit Etzersdorf – UW Theiss mast 101 – mast 151. The line becomes of SW Etzerzdorf to mast 125 as 380 kV double line and after integration of the 110 kV line UW Pottenbrunn – UW Theiss starting from mast 125 to mast 151 as 380/110 kV four-fold line. Edition of the 2nd system on the 380 kV line switching device Etzersdorf to UW Pottenbrunn.
Supplying and installing of altogether 2.300 tons duplex-coated mast parts. Move of 17 km 2 systems 380 kV “ACSR-rope” 564/72 triple faggots and 8,16 km 2 systems 110 kV rope 240/80.








