Customer: DB Projektbau GmbH
Construction period: 12.2007 – 05.2008
Location: Frankfurt/Oder, county Brandenburg
Country: Germany
Within a record construction period of about ten months a 443 m long, two-lane railway bridge has been constructed across the river Oder at Frankfurt (Oder), located in the county of Brandenburg. A bottleneck has been removed by this new railway bridge for the transportation of goods and public traffic in the European East-West-connection between Warsaw and Berlin.
This new bridge across the river Oder has a total span of 443 m and subdivides into a foreshore bridge (prestressed concrete box girder) on both, the German and Polish side and into a bridge across the river (network arch bridge) to cross the river itself.
Technical Details
Bridge area: 5,100 m²
Span: 3 × 59 m; 3 × 62 m; 48.70 m; 31.30 m
Steel composite: 1,100 t
Track construction: 1,050 m
Overhead contact line: 850 m











