DE | EN
     Worldwide 
Deutschland
Slovensko
Česká republika
Polska
Россия
Press | Downloads | Services | Contact |
ALPINE Bau GmbH
Konzern Bereiche Karriere Magazin
Landesklinikum Weinviertel
Landesklinikum „Weinviertel“ in Mistelbach

Client: Niederösterreichische Landesklinik-Holding
Construction period: 2011 – 2017
Location: Mistelbach, Lower Austria
Land: Austria

Niederösterreichische Landesklinik-Holding has commissioned a consortium led by ALPINE Bau GmbH with construction of the new Landesklinikum “Weinviertel” (”wine quarter” provincial hospital) in Mistelbach. The building project will be undertaken in the form of a general contractor agreement between ALPINE and VAMED, as well as the Lower Austrian Hypo-Leasinggesellschaft.

Around a year of intensive planning by the Moser and Maurer architectural consortium was required to prepare for renovation and extension of the Landesklinikum Weinviertel Mistelbach-Gänserndorf. The objective of the concept is not enlargement, but optimisation of functionality, paths and areas, to create a hospital where everything is within a short distance. By 2017 the hospital is expected to have 550 beds, and create 200 new jobs. The State of Lower Austria is investing a total of 186 million euros in the project.

Among other things, the plans include moving the main entrance, building a new surgical and intensive care centre, a family centre with a paediatric, gynaecological and obstetrics unit, an outpatients’ clinic for child and adolescent psychiatry, remodelling the outpatient and the first aid area, separating emergency and scheduled patients, designing a new, attractive outdoor area, and adding a parking level with 250 parking spaces. Other goals are to fundamentally improve the overall functionality in the hospital and incorporate clear structures to ensure good orientation for patients and visitors.

The Landesklinikum „Weinviertel“
The historic heart of the Weinviertel Provincial Hospital will be restored during the course of this construction project. Furthermore, a new building with 13,000 m² of floor space will be erected, which satisfies all the requirements made of modern medical standards. The particular challenge to be faced here is completion of renovation and extension work while maintaining normal hospital operation.

Borouge 3 industrial complex, Abu Dhabi Borouge 3 industrial complex, Abu Dhabi

more
Exhibition Centre Salzburg Exhibition Centre Salzburg

more
New development of the faculty of chemistry at the University of Danzig Faculty of chemistry / University of Danzig

more
New Central Railway Station, Vienna New Central Railway Station, Vienna

more
Tauern Spa World Kaprun TAUERN SPA Zell am See – Kaprun

more
Zoofenster, Berlin Zoofenster, Berlin

more
Multiversum Schwechat „Multiversum Schwechat“

more
Petrom City Petrom City

more
Heat exchanger tower at cement plant Leube Heat exchanger tower at cement plant Leube

more
Hoch ZWEI Plus ZWEI Hoch ZWEI Plus ZWEI

more
3 Towers 3 Towers in Bratislava

more
Empire Riverside Hotel Empire Riverside Hotel

more
 
  • Road Construction
  • Railway Construction
  • Bridge Construction
  • Power Station Construction
  • Building Construction
  • Underground Construction
  • Sports Facility Construction
  • Environmental Engineering
  • Foundation Engineering
  • Energy
  • Project Financing
  • Resources
  • Machinery
  • ALPINE Technology Management

Print page

Imprint | Privacy | Sitemap | RSS