Customer: University of Gdańsk
Construction period: 07.2010 – 06.2012
Location: Gdansk
Country: Poland
The contract is concerned with the complex construction of buildings of the faculty of chemistry of the University of Danzig on the ground of the Baltic Campus – bottom left. Bażyńskiego – Wita Stwosza with systems, networks and connections, technical equipment, outdoor facility management, pedestrian and bicycle routes, plantation and care of green spaces for one year.
The complex consists of 6 buildings with auditoriums, laboratories and other science rooms. The project includes the turnkey completion with technical and exterior facilities.
The construction project is financed by the European Union and takes means from the European Regional Development Fund as part of the operational programme for infrastructure and environment as well as by (Polish) budget funds.
Technical Data
Building area: 8,000 m²
Gross building volume: 28,180 m²
Usable surface: 23,766.70 m²
Cubature: 118,737. 85 m³
Floors: 3-5 (1 underground floor, ground floor and 1-3 upper floors)
Overall height: 9.10 – 21.20 m
Concrete: ca. 19,500 m³
Reinforcement: ca. 2,850 t
Elevators: 11
















