Customer: EON Kraftwerke GmbH
Construction period: 07.2008 – 06.2010
Location: Datteln
Country: Germany
In November 2007 the foundation has been laid for a new and highly efficient coal-fired power plant near the city of Datteln. The power plant block Datteln 4 will set a new standard in energy efficiency and protection of the climate for coal-based energy production. It has an efficiency factor of 45 percent. The commercial commissioning is planned for the beginning of 2011.
Alpine Bau Deutschland constructed 58 individual buildings and/or parts of the plant for the “New construction of the power plant Datteln 4″.
Features
The number of buildings to be constructed, construction of foundations and floor plates with ram and bore piles, funnel geometry for concrete-steel elements at the water treatment plant.
Technical data
In-situ concrete: ca. 55.000 m³
Concrete steel: ca. 6.500 tons
Formwork for foundations, walls, ceilings: ca. 95.000 m²