Metro Singapore C855
Metro Singapore C855

Customer: LTA, Land Transport Authority
Construction period: 08.2004 – 12.2010
Location: Singapore
Country: Singapore

This project consists of the construction of three train stations: Holland, Buona Vista (junction station of the existing east-west line) and NUH using the open cut tunnelling method and architecturally constructing the station ONH. The station’s shell has been already built by another company.

2 Slurry TBMs and 2 EPB TBM2 were used to drill a total of 8,248 m of single-lane tunnels. The tubes are lined with premanufactured reinforced concrete trough sections (so-called Tübbingen). A 300 m long turnout section was built south of the station ONH using the open cut tunnelling method.

Technical data
Dual-tube single-lane TBM Tunnels (Ø 6.61 m)
Total length: 8.248 m, 5 sections per tunnel
Cut section: 34.32 m²
Cuts: 290,000 m³

Bosruck Tunnel – Western Tunnel Bosruck Tunnel – Western Tunnel

more
New Kaiser Wilhelm Tunnel New Kaiser Wilhelm Tunnel, Ediger-Eller

more
Tapovan Vishnugad Headrace Tunnel (HRT) Tapovan Vishnugad Headrace Tunnel (HRT)

more
Gotthard base tunnel Gotthard base tunnel

more
Tradenberg tunnel Tradenberg tunnel

more
Metro Delhi AMEL-C6 Metro Delhi AMEL-C6

more
City-tunnel Leipzig City-tunnel Leipzig, Lot B

more
Lainzer tunnel Lainzer tunnel - LT 31 Maxing

more
Pinglu tunnel Pinglu tunnel

more
 
  • Road Construction
  • Railway Construction
  • Bridge Construction
  • Power Station Construction
  • Building Construction
  • Underground Construction
  • Sports Facility Construction
  • Environmental Engineering
  • Foundation Engineering
  • Energy
  • Project Financing
  • Resources
  • Machinery
  • ALPINE Technology Management

Print page

Imprint | Privacy | Sitemap | RSS