Customer: LTA, Land Transport Authority
Construction period: 08.2004 – 12.2010
Location: Singapore
Country: Singapore
This project consists of the construction of three train stations: Holland, Buona Vista (junction station of the existing east-west line) and NUH using the open cut tunnelling method and architecturally constructing the station ONH. The station’s shell has been already built by another company.
2 Slurry TBMs and 2 EPB TBM2 were used to drill a total of 8,248 m of single-lane tunnels. The tubes are lined with premanufactured reinforced concrete trough sections (so-called Tübbingen). A 300 m long turnout section was built south of the station ONH using the open cut tunnelling method.
Technical data
Dual-tube single-lane TBM Tunnels (Ø 6.61 m)
Total length: 8.248 m, 5 sections per tunnel
Cut section: 34.32 m²
Cuts: 290,000 m³