Customer: NTPC
Construction period: 2006 – 2012
Location: Chamoli-Distrikt, Uttarakhand
Country: Indien
We have been commissioned to construct a head race tunnel (HRT) for 4 x 130 MW HEP Tapovan for our client NTPC. We are using a Double Shield TBM and precast hexagonal-shaped segmental lining for the 8-km-long HRT section. The remaining 4.5-km-long section and adits are excavated by road header or drill & blast method
(NATM).
Feature
Challenging Himalaya region, heavily fractured and unstable fault zone and highly abrasive quartzite layers.