Customer: Asfinag
Construction period: 04.2009 – 10.2010
Location: Lower Austria
Country: Austria
This project covers the complete overhaul of about 8.5 km Westautobahn from the city of Auhof to the city of Wolfsgraben. The old concrete road surface will be removed completely and prepared for the lower supporting levels. The new concrete road surface will be constructed with additives. The drainage system will be completely renewed. The supporting formwork of bridges will be extended and the edge beams replaced.
Technical details
Asphalt removal: 24,400 m³
Concrete road surface removal: 31,000 m³
Water protection systems: 6
LSW construction: 1.570 m
LSW elements: 3.950 m²
Asphalt: 38.000 tons
Wind protection fence: 14.000 m
Concrete road surface: 212.600 m²
In-situ-concrete guide wall: 8.800 m
Shoulder: 11.800 m³
Guard rails: 8.900 m
Bridges: 7