Motorway section Arad Nadlac Lot 2
Motorway section Arad Nadlac Lot 2

Client: Compania Nationala de Autostrazi si Drumuri National din Romania SA
Construction period: 20.06.2011 – 10.04.2013 (construction period including planning and approval) Fidic Yellow Book contract
Location: East of Arad towards the Hungarian border
Country: Romania

The Arad Nadlac Lot 2 motorway project is located in western Romania, starting north of Pecica. The two-lane motorway to be built here, with a length of approx. 16.6 kilometres, is one of three sections with a total length of 220 kilometres. The other sections from Orastie to Sibiu (approx. 88 km) and from Lugoj to Deva (approx. 99 km) are being constructed in parallel. The construction also includes several bridges and flyovers, as well as two parking areas and a motorway maintenance depot.

Technical details:
2.5 million m³ of embankments
2 interchanges
1 motorway maintenance depot
2 parking areas with toilet facilities
250,000 tonnes of asphalt
10 bridges (maximum length 160 m)
35 culverts

Video Arad Nadlac

Video source: YouTube

Dual Carriageway S5, Poland Dual Carriageway S5, Poland

more
Project Y - PPP eastern region Project Y - PPP eastern region

more
A1 Poland Motorway A1 Poland

more
Bypass Trieben Bypass Trieben

more
A1 Western Motorway A1 West Motorway

more
Motorway A6 Kittsee Motorway A6 Kittsee

more
Ningbo motorway Ningbo motorway

more
Airport Vienna-Schwechat Airport Vienna-Schwechat

more
 
  • Road Construction
  • Railway Construction
  • Bridge Construction
  • Power Station Construction
  • Building Construction
  • Underground Construction
  • Sports Facility Construction
  • Environmental Engineering
  • Foundation Engineering
  • Energy
  • Project Financing
  • Resources
  • Machinery
  • ALPINE Technology Management

Print page

Imprint | Privacy | Sitemap | RSS