DE | EN
     Worldwide 
Deutschland
Slovensko
Česká republika
Polska
Россия
Press | Downloads | Services | Contact |
ALPINE Bau GmbH
Konzern Bereiche Karriere Magazin
07.10.2009
Donaubrücke Traismauer reduces negative effects of traffic
This reduces the route for commuters by 20 kilometres.

ALPINE works since autumn 2007 on the Danube bridge at Traismauer. It is the heart of a new road link between the Kremser dual carriageway S 33 and Stockerauer dual carriageway S 5. The contract section covers the Danube bridge itself and two foreshore bridges north and south of the river – a section of more than one kilometre in length.

The new Danube bridge at Traismauer improves accessibility of Central Lower Austria and part of the so called Regional-Ring-North. It provides an efficient axis between Stockerauer dual carriageway S 5 and the Kremser dual carriageway S 33 and leads to the Westautobahn A1 (motorway).

You´ll find the whole article in the printed customer magazine.

[Mit PicLens anzeigen]
dsc_7909
dsc_7942
dsc_7964
dsc_7849
dsc_7059
dsc_7052
_dsc4799
_dsc4805
_dsc4788
_dsc4782
_dsc4721
_dsc4751
_dsc4627
_dsc4467
_dsc4505

back

Danube bridge Traismauer

more
  • 2011
  • 2010
  • 2009
ALPINE-Magazine

The printed ALPINE magazine is published twice a year.

INSIDE 1/2009

INSIDE 1/2010

INSIDE 2/2010

INSIDE 1/2011

INSIDE 2/2011

Order form

Print page

Imprint | Privacy | Sitemap | RSS