Salzburg/ Faido, Switzerland: The breakthrough of the first tube of this section (length: around 30 km) of the Swiss Gotthard base tunnel took place between Bodio and Faido. The work for the EUR 1.5 billion project is guaranteed by the internationally renowned tunnel construction expertise of the Alpine Group.
“The breakthrough of the first tube of the Gotthard base tunnel is a pivotal moment in the course of this amazing structure’s history, “ says Ing. Siegfried Müller, Managing Director of Alpine. “Several difficult geological zones had to be overcome and it was necessary to excavate a tunnel approximately 14.5 kilometres long.





